Our Projects
- Country
- Location
- Product Type
- Roof Structure
- Sector/Application
- Show All
Reporoa T1 & 2
By the numbers:
Northlake
By the numbers:
Waitoa T4
By the numbers:
Waitoa T1
By the numbers:
Waitoa T3
By the numbers:
Alexandra
By the numbers:
MAP Projects
By the numbers:
Parallel Road Reservoir
By the numbers:
Temuka Reservoir
By the numbers:
Kaimanawa Reservoir
By the numbers:
Barramundi fish growing tanks
Design and construction of 8 tanks for growing barramundi fish including weir boxes and spray bars.
By the numbers:
Geodesic Dome a game change for odour control
Our client had an existing 15m diameter open topped Glass Fused to Steel tank which required a roof over it to contain the odour.
The tank was critical in the industrial wastewater processing system with the tank being filled during the day and drained overnight.
We craned on a geodesic dome roof while the tank was still in service to keep a lid on the smells.
By the numbers:
Factory Firewater
By the numbers:
Fielding Anaerobic Digestor
Design and Construction of Anaerobic Digestor Tank and associated equipment including geotechnical investigation and civil works Anaerobic Digestion.
PVC Membrane Roof
By the numbers:
Talleys Factory Water
Design and Construction of new Potable Water Tank including foundation works
Trough Deck Roof
By the numbers:
Queenstown
Designed to Retrofit a Tapered Beam Roof
By the numbers:
Richmond Wastewater Treatment Plant
Design and Construction of new Potable Water Tank including foundation works
Trough Deck Roof
By the numbers:
Richmond East
Design and Construction of new Potable Water Tank including foundation works works
Geodesic Dome Roof
By the numbers:
Railway Road Bore Water Tank
Design and Construction of new Bore Water Tank including geotechnical investigation and civil works and associated pipework Bore Water
Trough Deck Roof
By the numbers:
Mount Isa Potable Water Reservoir
Design and Construction of new Potable Water Tank including geotechnical investigation and civil works
Trough Deck Roof
By the numbers:
Levin Water Treatment Plant
Design and Construction of new Potable Water Tank including foundation works
External Beam Roof
By the numbers:
Huntly
Design and Construction of new Potable Water Tank including foundation works
Geodesic Dome Roof
By the numbers:
Hopuhopo
Design and Construction of new Potable Water Tank including foundation works
Geodesic Dome Roof
By the numbers:
Gore Wastewater Storage Reactor Tank
Design and Construction of new Reactor Tank
Open Topped
By the numbers:
Gore Wastewater Storage WAS Tank
Design and Construction of WAS Tank
Open Topped
By the numbers:
Craigieburn Wastewater
Design and Construction of Wastewater Storage Tank including Geodesic Dome Roofs
By the numbers:
Branxholme
Design and Construction of Backwash Tank including foundation works and associated sump and pipework
Backwash Tank, Trough Deck Roof
By the numbers:
Van Leuwen
Design and Construction of Slurry Tank including foundation works and associated agitation equipment
Roof: Open Top
By the numbers:
Alan Black
Design and Construction of Slurry Tank including foundation works.
Design: Open Top.
By the numbers:
Ashurst Water Treatment Plant
Design and Construction of Potable Water Tank including foundation works
Roof: Geodesic Dome Roof
By the numbers:
Aokauture No.1 Reservoir
Design and Construction of Potable Water tank including foundation and associated pipeworld.
Random facts: Tank + Roof Weight – 331.7kN
Contents Weight 26036.8kN