Rapid Installation Times

Permastore Tanks are renowned and valued for their modular design and associated rapid erection times.  Permastore tanks can be installed in less than 50% of the time of comparable concrete tanks.

A recent example of the Peramstore Modular Bolted Tank Construction which successfully highlights the very rapid installation times of the Permastore Glass-Fused-to-Steel solution is the drinking water tank, (pictured above), with a capacity of 1774m3 (1,774,000L).  These were shipped to Nelson Port and then installed utilising the experience of the Reliant Solutions team and our jacking system in a total build time of less than 3 weeks

Our jacking system allows build work to be carried out at ground level, giving build time benefits and crew safety benefits.

So do not delay, contact the Reliant Solution Sales Team today to discuss your next rapid build Glass-Fused-to-Steel Containment Solution!